Turn Key execution for the realization of a plant for the sinthesys and recovery of an inorganic chemical compound. Plant is composed by 1.000 mc reaction units and section for recovery composed by rotary vacuum filters, spin flash dryer, mills, filters, packing machines. Execution included mechanical eletrical instrumental civil HVAC works.
Multiproduct centrifugation department with nr. 2 Horizontal Axes Centrifuges from KMPT. The first antiacid in Hastelloy C22 and the second in AISI316L. The installation was following the turn key formula with all engineering, mechanical, civil and electroinstrumental activities included in the scope of supply.
Double stage reverse osmosys with a maximum rate of 5 mc/h. Storage in sanitary Vessel with a capacity of 20.000 litres. Distribution loop with 30 working points in ATEX area and a total lenght of 1.400 mt.
AISI 304 Bag Filter 400 sqm with reverse pulse jet cleaning. Atex certification CE EX II 3GD T4. Filter is used for inorganic powder recovery from a spin flash dryer.
400.000 litres storage in AISI304. Reverse Osmosys skid unit with capacity 100 mc/h for water production at 5 msiemens conductivity. Distribution piping in 4 inches AISI304 stainless steel.
Pressure stabilization for Natural Gas with filtration, dehumidification and safety devices.
Nr. 12 package units ATEX certified for zone 1 for heating and cooling of equipment. Capacity is 90.000 kW each and the sope of supply was to have very simple battery limit for easy connection and installation.
CH4 cogeneration plant 1 MWhe with insonorization box, cooling tower, torch, control cabinet, power center, 15.000 V transformer. All system is in Skid mounted unit.
Turnkey Biogas production plant composed of 4 fermenters for a total volume of 19.000 mc. Cogeneration plant for a total power of 999 kWhe plus heat recovery system.